@Green March/April 2021 | Page 19

March-April , 2021 | @ green opinion

19
LSS2 Packages
‘ Raw ’
No . of
No . of
offer prices
Bids
Shortlisted
( RM / kWh )
Submitted Bids
Peninsular Malaysia Package P1 : 1.00MWa . c . 0.3750 - to 5.99MWa . c . 0.4700 25 6 Package P2 : 6.00MWa . c . 0.3700 - to 9.99MWa . c . 0.4600 18 11
Package P3 : 10.00MWa . c . 0.3398 - to 30.00MWa . c . 0.5000 43 13
Sabah / Labuan
Package S1 : 1.00MWa . c .
0.3710 -
to 5.99MWa . c .
0.5300
19
8
Package S2 : 6.00MWa . c .
0.3900 -
to 10.00MWa . c .
0.4900
12
3
Total 41 / 117 bids were awarded
LSS3 Bid Prices Peninsular Malaysia only
Range of Capacity Lowest Bid Price Next Lowest Bid No . of Bids
( Split according to ( Plant Capacity )
Price
Submitted
LSS4 categories )
( Plant Capacity )
10MWa . c . -
RM0.2339 / kWh
RM0.2500 / kWh
15
29.99MWa . c .
( 29.9MWa . c .)
( 23.4MWa . c .)
30MWa . c . -
RM0.2340 / kWh
RM0.2477 / kWh
13
50MWa . c .
( 50MWa . c .)
( 40MWa . c .)
Overall
RM0.17777 / kWh
RM0.2297 / kWh
112
( 100MWa . c .)
( 75MWa . c .)
did not aggregate to the 500MWa . c . capacity which was offered under that package , with the shortfall of 176.94MWa . c . being quite a considerable variance .
If applied towards the P2 Package , the amount of shortfall could have seen an additional three to six projects being awarded .
Some industry players have intimated that the fact that awards under the P1 Package have not met the targeted amount gives the impression that bids submitted under that package may have been of a lower standard than those offered under the P2 Package .
There may be some truth in that as the targeted amount of 500MWa . c . under the P2 Package was met with all awards made to projects of 50MWa . c ., being the maximum capacity on offer , and for bid prices which are more aggressive compared to bid prices of shortlisted bids under the P1 Package . One reason could be that bids under the P1 Package would also not be as financially attractive as under the P2 Package as projects under the P1 Package are smaller and would not have the economies of scale compared to projects under the P2 Package .
Hence , serious players ( those generally considered better placed to submit more compelling bids ) would not be as interested in participating under the P1 Package .
Conclusion
The EC appears to have met the aim of parcelling out LSS4 awards on a more “ equitable ” basis to local players , resulting in more jobs for local contractors .
However , it may have come at a price as the EC ’ s actions prohibiting foreign participation have been widely viewed as a protectionist move . That does not augur well for the economy in general
Some industry players have intimated that the fact that awards under the P1 Package have not met the targeted amount gives the impression that bids submitted under that package may have been of a lower standard than those offered under the P2 Package .”
when the nation sorely requires more foreign direct investment , especially if such investment brings with it opportunities for local players to learn from some of the best practices that could be introduced by foreign participants .
It is hoped that the EC could , in its future programmes , not only discard the protectionist stance . They should structure the plans such that awards are made to achieve maximum benefit for the nation and not only to placate those who , but for the way the LSS4 programme was structured , would not have been able to compete on an even playing field with the rest . — @ green
LSS4
‘ Raw ’ offer No . of
No . of
Peninsular Malaysia
prices
Bids
Shortlisted
only
( RM / kWh )
Submitted
Bids
Package P1 :
0.1786 -
44
20
10MWa . c . -
0.2481
( Price range
29.999MWa . c .
from RM0.1850 / kWh to RM0.2481 / kWh )
Package P2 :
0.1399 -
93
10
30MWa . c . -
0.2388
50MWa . c .
( Price range from RM0.1768 / kWh to RM0.1970 / kWh )
Total 30 / 137 bids were awarded
Listed Company
Primary
Bidder
Capacity
Business
A
awarded
MK Land Holdings
Property
MK Land
10.95MWa . c .
Berhad
development
Resources
Sdn . Bhd .
Tan Chong Motor
Automotive
Tan Chong Motor
20MWa . c .
Holdings Berhad
A
assemblies Sdn . Bhd ., APM Shock Absorbers Sdn . Bhd . and TCIM Sdn . Bhd .
Uzma Berhad
Oil & Gas
Uzma Environergy 50MWa . c .
Sdn . Bhd .
Ranhill Utilities Water Supply , Ranhill Utilities 50MWa . c Berhad Services and Berhad
Treatment .
JAKS Resources
Conventional
JAKS Solar
50MWa . c .
Berhad
Power ,
Power
Construction
Sdn . Bhd .
and Property
Gopeng Berhad
Oil Palm
Gopeng Berhad
50MWa . c .
Plantation