March-April , 2021 | @ green opinion
19
LSS2 Packages |
‘ Raw ’ |
No . of |
No . of |
|
offer prices |
Bids |
Shortlisted |
( RM / kWh ) |
Submitted Bids |
Peninsular Malaysia Package P1 : 1.00MWa . c . 0.3750 - to 5.99MWa . c . 0.4700 25 6 Package P2 : 6.00MWa . c . 0.3700 - to 9.99MWa . c . 0.4600 18 11
Package P3 : 10.00MWa . c . 0.3398 - to 30.00MWa . c . 0.5000 43 13
Sabah / Labuan
Package S1 : 1.00MWa . c . |
0.3710 - |
|
|
to 5.99MWa . c . |
0.5300 |
19 |
8 |
Package S2 : 6.00MWa . c . |
0.3900 - |
|
|
to 10.00MWa . c . |
0.4900 |
12 |
3 |
Total 41 / 117 bids were awarded
LSS3 Bid Prices Peninsular Malaysia only
Range of Capacity Lowest Bid Price Next Lowest Bid No . of Bids |
( Split according to ( Plant Capacity ) |
Price |
Submitted |
LSS4 categories ) |
( Plant Capacity ) |
|
10MWa . c . - |
RM0.2339 / kWh |
RM0.2500 / kWh |
15 |
29.99MWa . c . |
( 29.9MWa . c .) |
( 23.4MWa . c .) |
|
30MWa . c . - |
RM0.2340 / kWh |
RM0.2477 / kWh |
13 |
50MWa . c . |
( 50MWa . c .) |
( 40MWa . c .) |
|
Overall |
RM0.17777 / kWh |
RM0.2297 / kWh |
112 |
|
( 100MWa . c .) |
( 75MWa . c .) |
|
did not aggregate to the 500MWa . c . capacity which was offered under that package , with the shortfall of 176.94MWa . c . being quite a considerable variance .
If applied towards the P2 Package , the amount of shortfall could have seen an additional three to six projects being awarded .
Some industry players have intimated that the fact that awards under the P1 Package have not met the targeted amount gives the impression that bids submitted under that package may have been of a lower standard than those offered under the P2 Package .
There may be some truth in that as the targeted amount of 500MWa . c . under the P2 Package was met with all awards made to projects of 50MWa . c ., being the maximum capacity on offer , and for bid prices which are more aggressive compared to bid prices of shortlisted bids under the P1 Package . One reason could be that bids under the P1 Package would also not be as financially attractive as under the P2 Package as projects under the P1 Package are smaller and would not have the economies of scale compared to projects under the P2 Package .
Hence , serious players ( those generally considered better placed to submit more compelling bids ) would not be as interested in participating under the P1 Package .
Conclusion
The EC appears to have met the aim of parcelling out LSS4 awards on a more “ equitable ” basis to local players , resulting in more jobs for local contractors .
However , it may have come at a price as the EC ’ s actions prohibiting foreign participation have been widely viewed as a protectionist move . That does not augur well for the economy in general
Some industry players have intimated that the fact that awards under the P1 Package have not met the targeted amount gives the impression that bids submitted under that package may have been of a lower standard than those offered under the P2 Package .”
when the nation sorely requires more foreign direct investment , especially if such investment brings with it opportunities for local players to learn from some of the best practices that could be introduced by foreign participants .
It is hoped that the EC could , in its future programmes , not only discard the protectionist stance . They should structure the plans such that awards are made to achieve maximum benefit for the nation and not only to placate those who , but for the way the LSS4 programme was structured , would not have been able to compete on an even playing field with the rest . — @ green
LSS4 |
‘ Raw ’ offer No . of |
No . of |
Peninsular Malaysia |
prices |
Bids |
Shortlisted |
only |
( RM / kWh ) |
Submitted |
Bids |
Package P1 : |
0.1786 - |
44 |
20 |
10MWa . c . - |
0.2481 |
|
( Price range |
29.999MWa . c . |
|
|
from RM0.1850 / kWh to RM0.2481 / kWh ) |
Package P2 : |
0.1399 - |
93 |
10 |
30MWa . c . - |
0.2388 |
|
|
50MWa . c . |
|
|
( Price range from RM0.1768 / kWh to RM0.1970 / kWh ) |
Total 30 / 137 bids were awarded
Listed Company |
Primary |
Bidder |
Capacity |
|
Business |
A |
awarded |
MK Land Holdings |
Property |
MK Land |
10.95MWa . c . |
Berhad |
development |
Resources |
|
|
|
Sdn . Bhd . |
|
Tan Chong Motor |
Automotive |
Tan Chong Motor |
20MWa . c . |
Holdings Berhad |
A |
assemblies Sdn . Bhd ., APM Shock Absorbers Sdn . Bhd . and TCIM Sdn . Bhd . |
|
Uzma Berhad |
Oil & Gas |
Uzma Environergy 50MWa . c . |
|
|
Sdn . Bhd . |
Ranhill Utilities Water Supply , Ranhill Utilities 50MWa . c Berhad Services and Berhad
Treatment .
JAKS Resources |
Conventional |
JAKS Solar |
50MWa . c . |
Berhad |
Power , |
Power |
|
|
Construction |
Sdn . Bhd . |
|
|
and Property |
|
|
Gopeng Berhad |
Oil Palm |
Gopeng Berhad |
50MWa . c . |
|
Plantation |
|
|