Cenergi ’ s commitment to excellence and diversification

Company ’ s vision is to be the premier sustainable utility company in Southeast Asia
Cenergi ' s Portfolio Map
Cenergi is the largest gridconnected biogasto-energy power plant developer and operator in Malaysia .”

Incorporated in 2013 , Cenergi SEA ( Cenergi ) is a premier sustainable energy solutions company . It specialises in reducing carbon footprint through its operating plants and projects in Malaysia for Renewable Energy ( RE ), Energy Efficiency ( EE ) and New Venture businesses in Malaysia and Southeast Asia .

In March 2020 , there was a transition in Cenergi ’ s senior management position , with Hairol Azizi Tajudin appointed to Group Chief Executive Officer ( GCEO ).
He has plans to lead Cenergi to the next level . He shared : “ Cenergi ’ s vision is to be the premier sustainable utility company in Southeast Asia .
“ Cenergi has proven itself to be one of the leaders in Malaysia ’ s renewable energy industry , with a commendable track record and well-diversified portfolio .”
All Cenergi ’ s RE operational projects in generating sustainable energy are developed and operated by Cenergi . Cenergi ’ s portfolios in managing RE include gridconnected biogas power plants , Feed-in Tariff solar farms , commercial rooftop solar systems , and biomass pellet plant .
“ Our company is equipped with in-house
talent and experience , needed to propel us in the right direction towards materialising our strong project pipeline in the coming years .”
Cenergi ’ s biogas plants are developed by Cenergi ’ s very own engineering , procurement , construction ( EPC ) team and are now operated by the internal operations and maintenance team .
“ Being a company in the renewable energy and sustainable industry , we believe that a sustainable business operation is paramount .
“ Hence , operational excellence is key . The management now is driving this culture at all levels and in all activities that we do .”
“ We also are strongly committed to health and safety , reflecting our high operational standards and the importance of employee wellbeing . Since inception , we have successfully clocked over 1.5 million safe man-hours ,” added Hairol .
Cenergi ’ s operating plants and projects
“ On the biogas front , Cenergi is to date the largest grid-connected biogas-to-energy power plant developer and operator in Malaysia ,” said Hairol .
The biogas power plants utilise methane - captured from palm oil mill effluent ( POME ), the palm oil industry ’ s byproduct - as the primary fuel source .
Cenergi Hamparan 3.0 MW Biogas Power Plant ( Lampung , Sumatera ).
Aerospace Composites Malaysia ( ACM ) 3.0 MW Solar Power Plant ( Bukit Kayu Hitam , Kedah ).